Expedition Trip Reports

March 5, 2011

Eggspedition- Plumbing Mods

Time to tackle plumbing upgrades!


Decided to upgrade to a DSI water heater.

Removed-


New cold water shut-off valve/by-pass-


Plumbed & Wired-


Primed ring to prevent surface rust-


Installed new brushed nickel fixtures with lever handles-

Before-


After- with new b.n. drains


High-rise faucet-


8" centers-


Before-


After-


New shower head with hose holders-



Removed sink p-trap for cleaner look, new b.n. shower drain-


Installed HepVo in closet-


Removed shower p-trap & valve for hepvo-


Installed grey tank vent hose, tapped-


After-


Installed interior tank drain valve, replaced rotted OSB blocking with cedar-


Replaced clogged refrigerator drain-

No comments:

Post a Comment